Skip to content

VC365 for oil & gas See Critical Conditions. Before They Escalate.

AI-powered visual checks for fields, platforms, pipelines, plants and terminals, mapped to the life-saving rules and process-safety standards you work to.

Built for

  • Onshore fields
  • Offshore installations
  • Pipelines and stations
  • Refineries and gas plants
  • Terminals and depots
  • Contractors and turnarounds

Why it matters

Major Hazards Are Managed One Small Check at a Time

A permit at the work site. A tag on a valve. A reading on a detector. A barrier around a lift. VC365 turns each into a live, photo-backed check tied to the exact asset, so the people who decide can see field conditions without walking every unit.

  • Distributed facilities

    Each check is tied to an asset by QR label, with a time-stamped record of who did it and on which shift.

  • Rotations and contractors

    Tasks belong to roles. Crews change every rotation; the checks and their history do not.

  • High consequence

    A safety-critical check never passes or fails on AI alone. A person confirms.

How it works

From Observation to Action

One loop, shown here on a single bund check on a tank-farm round.

  1. 01

    Define

    A “Tank-farm round” SOP: the checks, the schedule, the role.

  2. 02

    Capture

    An operator photographs the bund drain valve, live.

  3. 03

    Understand

    AI notes the valve is open. The result is FAIL.

  4. 04

    Improve

    A corrective action, a recheck, a verified close.

Example checks

Visual Checks for Oil & Gas

Each one is an atomic check: one visible question, with an example photo, a schedule and the role that does it. Copy them, change them, or write your own.

  • Permit and precautions at the job

    Permit displayed, barriers up, fire watch in place.

  • Isolation tags

    Tags visibly in place, tag number read.

  • Wellhead and cellar condition

    Valves, gauges and cellar photographed for leaks and damage.

  • Muster stations

    Clear, signed and equipped.

  • Cathodic-protection test posts

    Intact, with the display reading captured.

  • Earthing and bonding connected

    Clamp attached before loading starts.

  • Scaffold tags

    Inspection tag present and in date.

  • Confined-space set-up

    Signage, attendant and rescue equipment in place.

Scheduling

The Right Check. At the Right Time.

Facilities run on shifts and rotations. Each SOP is scheduled by site and role, so the right checks appear when the work does.

  1. Start of shift

    At handover

    PPE at the unit · Open permits and isolations · Area housekeeping · Windsock and escape routes

  2. Rounds

    On an interval

    Gauge and level displays · Visible leaks and drips · Bund drain valves · Detector displays

  3. Before the job

    When work starts

    Permit displayed · Isolation tags in place · Barriers up · Fire watch and extinguisher ready

  4. Rotation

    At crew change

    Muster stations · Lifeboats and life rafts · Emergency equipment in date

  5. Periodic

    Weekly and monthly

    Fire extinguishers and monitors · Lifting gear tags · Spill kits · Hazardous-area labels

Example schedule. You choose the checks, times and roles. A check nobody did in time is Missed, and is never counted as failed.

Standards

One Check. Many Standards.

Eleven everyday field checks, the IOGP Life-Saving Rule each one supports, and the matching regulatory references.

One Check. Many Standards.: each atomic check and the requirements it helps evidence
Atomic checkIOGP Life-Saving RuleUS OSHA 29 CFRISO 45001
Permit displayed at the work siteWork authorisation1910.119(f)8.1
Isolation tags and locks in placeEnergy isolation1910.1478.1.2
Confined-space signage and attendantConfined space1910.1468.1.2
Hot-work area preparedHot work1910.252, 1910.119(k)8.1.2
Gas detector display readingHot work, Confined space1910.1469.1
Exclusion barriers in placeLine of fire—8.1.2
Lifting gear tags in dateSafe mechanical lifting1910.1848.1.2
Harness, anchor and scaffold tagWorking at height1910.28, 1910.1408.1.2
Safety-device seals and tags intactBypassing safety controls1910.119(j)8.1.2
Vehicle pre-trip and seat beltsDriving—8.1
PPE at the unit—1910.1328.1.2

Indicative mapping. References point to the clause family each check supports. Confirm them against the current text and with your certification body or regulator. VC365 produces the evidence; it does not certify compliance.

Standards these checks can be mapped to

  • IOGP Life-Saving Rules
  • OSHA PSM (29 CFR 1910.119)
  • ISO 45001:2018
  • ISO 14001:2015
  • API RP 754
  • API RP 75
  • API 570 and API 653
  • EU Seveso III Directive
  • EU Directive 2013/30/EU
  • ATEX 1999/92/EC and IECEx

Your segment

Where VC365 Fits in Oil & Gas

The same platform, set up for the way each part of the sector works.

  • Onshore fields

    Hundreds of Wellpads. One Clear View.

    A producing field is scattered wellpads, flowlines and gathering stations visited by small crews. VC365 turns each visit into a record tied to the well, so the field office sees every site’s condition.

    • Wellhead and cellar condition
    • Pressure gauge readings
    • Signage and fencing
    • Chemical-injection skids
    • Flare and vent area
    • Site housekeeping
  • Offshore installations

    Every Rotation. The Same Readiness.

    Offshore, the crew changes but the hazards do not, and help is far away. VC365 gives each incoming crew the same checks and the outgoing crew’s findings, with the record synced when connectivity allows.

    • Muster stations
    • Lifeboats and life rafts
    • Helideck readiness
    • Deck housekeeping and dropped objects
    • Lifting gear and crane checks
    • Escape routes and lighting
  • Pipelines and stations

    A Thousand Kilometres. Walked on Record.

    Pipelines run through country no supervisor can cover. Patrols and station rounds are the eyes of the system. VC365 makes each patrol point a photographed, located, comparable record.

    • Right-of-way condition
    • Markers and warning signs
    • Block-valve stations
    • Cathodic-protection test posts
    • Pump and compressor skids
    • Pig launcher and receiver
  • Refineries and gas plants

    Complex Units. Simple, Visible Checks.

    In a process plant the barriers are layered and mostly instrumented. Around them sits a visible layer that people check many times a day: permits, tags, barriers, housekeeping, labels. VC365 makes that layer a record.

    • Permit and precautions at the job
    • Isolation tags
    • Scaffold tags
    • Gauge and level displays
    • Sample points and drains
    • Unit housekeeping
  • Terminals and depots

    Every Transfer. Checked Before It Starts.

    At a terminal the risk concentrates at the transfer: the loading bay, the jetty, the tank. Earthing, hoses, bunds and barriers are visible and quick to check. VC365 ties each to the bay and the shift.

    • Earthing and bonding connected
    • Loading hoses and arms
    • Bund drain valves
    • Tank gauges and level displays
    • Vehicle and driver at the gate
    • Fire monitors and foam points
  • Contractors and turnarounds

    Peak Headcount. No Drop in Standard.

    During a turnaround the site may hold several times its normal workforce, most of them contractors new to the plant. VC365 holds every company to the same pre-job checks, with its own findings to close.

    • Contractor mobilisation
    • Toolbox talk held
    • Scaffold and access
    • Lifting plan and exclusion zone
    • Confined-space set-up
    • End-of-shift housekeeping

In action

From a Missing Tag to a Verified Fix

One critical exception, followed from the photo to closure. Because the check is Critical, the AI flags it and a person decides.

  1. 01

    Captured

    A valve is photographed before maintenance starts.

  2. 02

    Flagged

    AI sees no isolation tag. Critical, so it goes to a person.

  3. 03

    Confirmed

    The supervisor confirms FAIL. A finding opens.

  4. 04

    Verified

    New evidence shows the tag, its number read.

Illustrative example with sample data. The original finding stays on record.

Honest by design

Know the Limits

VC365 produces and assesses evidence. Certification stays with you and accredited bodies, and a picture only shows what is visible.

  • Missed is not failed

    A skipped check and a check found wrong are different problems, counted separately.

  • People decide on doubt

    AI never fails a High or Critical check alone, and an AI outage never becomes PASS or FAIL.

  • VC365 complements instrumented safety systems and your permit-to-work system. It replaces neither.

  • A tag in the picture shows the tag. A completed isolation is confirmed by your permit system and a competent person.

  • A photographed detector display is one reading at one moment. It does not prove a gas-free atmosphere.

  • A visual round does not replace thickness testing or inspection by a qualified inspector.

  • Use only devices approved for the area. Device certification for hazardous zones is your site’s decision.

FAQ

VC365 for Oil & Gas: Questions Buyers Ask

Is VC365 a permit-to-work system?

No. VC365 photographs the permit and its precautions at the work site, but it is not a safety instrumented system, a permit-to-work system or an inspection programme, and it does not replace any of them.

Can VC365 be used in hazardous areas?

VC365 runs on smartphones, so use only devices approved for the area you are working in. Device certification for hazardous zones is your site’s decision.

Does it work offshore or at remote wellpads without a signal?

Yes. It is designed for up to 72 hours offline; evidence waits on the device, marked as queued, and syncs when connectivity allows.

Which standards can field checks be mapped to?

Field checks can be mapped to the IOGP Life-Saving Rules, OSHA 29 CFR 1910 including process safety management (1910.119), ISO 45001 and ISO 14001, API codes, and EU Seveso III and offshore rules. The mapping is indicative, and VC365 does not certify compliance.

Does a photo of an isolation tag confirm the isolation?

No. A photo shows a tag in place, and VC365 can read its number. A completed isolation is confirmed by your permit system and a competent person.

How are contractors handled during a turnaround?

Every company on site follows the same pre-job checks and sees and closes its own findings, and the turnaround team sees pre-job compliance by area each morning.

See VC365 on Your Oil & Gas SOPs

Book a demo and we will walk through your procedures with you, or create your organisation and start with one site today.